TESTING PROTOCOLS

Each protocol is generated from our Quality Management System and is tailored to meet the specific needs of the client, with guidance and consultation throughout. Prior to any work being undertaken, a site visit is necessary to perform a full risk assessment and an environmental monitoring program devised on the outcome. If this is not possible an interim risk assessment can be performed using comprehensive maps of the facility and detailed process flow. A client-specific document is prepared containing all aspects of testing requirements, incubation needs, reporting of results and additional further testing for discussion/ approval by the Client. Only when the Client is completely satisfied with the proposed package will a signature be requested and work will commence.

Our services range from one-off sampling to commission studies, validation, routine ‘At-Rest’ monitoring and ‘In-Operation’ monitoring.

 
Back to Top